Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Drain boilers primary circuit
Observation:
Check pressure of expansion vessel (located behind combustion chamber).
It is factory pre-set at 0.5 bar.
It is factory pre-set at 0.5 bar.