Set Appliance State:
Mains Power Off
Turn Hot Water Tap On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the red wire marked "E" and the yellow wire marked "C" at M10 on the PCB.
At the sparking stage of the ignition sequence approximately 215V DC should be measured.
Note:
Boiler will attempt ignition 3 times before going to lockout.
Reset by turning power off then back on as necessary.
At the sparking stage of the ignition sequence approximately 215V DC should be measured.
Note:
Boiler will attempt ignition 3 times before going to lockout.
Reset by turning power off then back on as necessary.

Isolate as per TOPs P4
and refit as necessary