Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect wires from APS noting connections
Measurement:
Check resistance between terminals 1 and 3 (left and rear of APS as viewed from the front of the boiler).
Open circuit expected.
Open circuit expected.

Isolate as per TOPs P4
and refit as necessary