Set Appliance State:
Isolate Mains Power to appliance as per TOPs P4
Remove plastic cover from control box
Selector switch to hot water position
Remove plastic cover from control box
Selector switch to hot water position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure voltage across the live connection marked L3 (brown wire) and the neutral connection marked N2 on the molex plug next to the transformer (CN1/CN4) on the main PCB.

Isolate as per TOPs P4
and refit as necessary