Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Fit a link between the two connections marked C and D at the front of the PCB
Main switch in ON position
Summer/Winter Switch in Winter position
Main switch in ON position
Summer/Winter Switch in Winter position
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Observation:
With the external controls / integral timer (if fitted) linked out does the fan speed now increase?
Note:
Remove link and refit wires after test.
Note:
Remove link and refit wires after test.
Isolate as per TOPs P4
and refit as necessary