Set Appliance State:

Mains Power Off
CH Demand
Mode Selector Switch to CH position
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Observation:

Run central heating for a couple of minutes and monitor the system pressure on the gauge. The system pressure must remain in the range 1.0 - 3.0 bar.