Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Gain access to PCB (use Insulation Mat as required)
Ensure No demand is present
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Cancel boiler purge / self-check (reset) if required.
Test 1. Wait 20 seconds then measure for DC voltage across pins 1 through 6 of connector X14 to a suitable earth connection.
Expected voltage approx 28 Vdc present on all pins, if voltages are not as expected then choose that option from below.
Test 2. Place boiler into st/by mode, wait 10 seconds then exit st/by, during initial 15 seconds, measure for dc voltage across pin 3 of connector X14 & a suitable earth connection.
Voltage should fluctuate during the initial 15 seconds then return to approx 28Vdc, (Note. Repeat as required until test complete).
Test 3. Repeat test 2 for pins 4, 5 & 6.