Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove electrode assembly from boiler
Measurement:
Thoroughly check the spark electrode for;
Resistance, tip of electrode to ignition lead connector, expected resistance 1Kohm.
Wear and/or warping
Contamination
Cracks and/or damage to ceramic
Confirm electrode gap is 5mm +/- 1mm.
Note.
Refer to adapt regarding any gasket / seal replacement requirements.
Note.
Refer to adapt regarding any gasket / seal replacement requirements.

Isolate as per TOPs P4
and refit as necessary