Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Observation:
Confirm, inspect boiler for;
PCB connections are correctly fitted.
Boiler connections to sensors, fan, pump etc are correctly fitted.
Check for water ingress on to PCB and/or boiler connections.