Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Gas Off
DHW Demand
Attach a U-gauge to the inlet pressure test point
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Press reset to cancel purge cycle countdown.
Allow the boiler to run its ignition sequence.
Is there a visible 'blip' on the U-gauge as the gas valve opens?
Note.
When pressure gauge is removed the pressure test point should be tightened and checked for gas tightness.