Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow purge cycle to commence.
Measure the voltage across connection 1 and 2 at connector X16 on the PCB.
Connections are numbered 1-5 from left to right.
Expect mains voltage.