Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Press reset to cancel purge cycle countdown.
Measure the voltage across connection 3 (blue) and 5 (brown) at connector X16 on the PCB.
Connections are numbered 1-5 from left to right.
Expect mains voltage.
Measure the voltage across connection 3 (blue) and 5 (brown) at connector X16 on the PCB.
Connections are numbered 1-5 from left to right.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary