Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove the retaining pin which holds the diverter motor in place, rest the motor on the boiler chassis in front of the diverter valve with the spindle facing upwards
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Press reset to cancel purge cycle countdown.
CH demand.
Check the position of the spindle, it should retract
fully for CH operation.
CH demand.
Check the position of the spindle, it should retract
fully for CH operation.
Isolate as per TOPs P4
and refit as necessary