Set Appliance State:

Mains Power Off
Set Multimeter to DC Volts Set meter to measure DC Volts
DHW Tap Off
Summer/Winter Selector to Summer
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Press reset to cancel purge cycle countdown.
Measure the voltage across connections 3 (blue) and 6 (orange) at connector X17 at the PCB.
Expected voltage less than 4 volts DC.