Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Boiler DHW thermostat set to MAX
Both wires connected to Modureg
Both wires connected to Modureg
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and boiler to run in DHW mode.
With a flow rate at the tap of approximately 11.4 l/min, there should be a temperature rise of approximately 35°C and operation should be satisfactory.
With a flow rate at the tap of approximately 11.4 l/min, there should be a temperature rise of approximately 35°C and operation should be satisfactory.