Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Attach 1 temperature clamp on the return pipe inside the boiler just above the pump nut as indicated by the red arrow
Attach the second temperature clamp on the flow pipe to the radiators (furthest right hand pipe) after the isolation valve
Boiler CH thermostat set to MAX
Attach the second temperature clamp on the flow pipe to the radiators (furthest right hand pipe) after the isolation valve
Boiler CH thermostat set to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow the burner to ignite and the boiler to run in central heating mode for at least 2 minutes.
Monitor the temperature of the two pipes.
Is the flow pipe to the radiators hotter than the return pipe to the heat exchanger inside the boiler?
Note:
Ensure a good contact is made with the temperature clamps.
Monitor the temperature of the two pipes.
Is the flow pipe to the radiators hotter than the return pipe to the heat exchanger inside the boiler?
Note:
Ensure a good contact is made with the temperature clamps.