Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Ensure gas valve connector is re attached to gas valve
Remove connector M7 from the PCB
Remove connector M7 from the PCB
Measurement:
Test 1:
Measure the resistance between pin 22 on connector M7 and a suitable earth.
Expect a reading of 1 Mohm or greater.
Test 2:
Measure the resistance between pin 23 on connector M7 and a suitable earth.
Expect a reading of 1 Mohm or greater.
Are the resistances as expected?
Measure the resistance between pin 22 on connector M7 and a suitable earth.
Expect a reading of 1 Mohm or greater.
Test 2:
Measure the resistance between pin 23 on connector M7 and a suitable earth.
Expect a reading of 1 Mohm or greater.
Are the resistances as expected?

Isolate as per TOPs P4
and refit as necessary