Set Appliance State:
Gas Off
CH Demand
Isolate Mains Power to appliance as per TOPs P4
Gain access to terminal strip
Gain access to terminal strip
| WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure |
Measurement:
With a Central Heating demand, measure the Mains Voltage across connection 1 (Violet) and N (Blue) on the Appliance Terminal Block.

Isolate as per TOPs P4
and refit as necessary