Set Appliance State:
Gas Off
Isolate Mains Power to appliance as per TOPs P4
Measurement:
Disconnect the two Brown wires from the Water Pressure Switch and measure the resistance across the Switch.
Replace leads after test.
Replace leads after test.

Isolate as per TOPs P4
and refit as necessary