Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Pull connector X4 back slightly to expose soldered points on PCB as shown
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Reset appliance to skip self check and allow boiler to begin ignition sequence.
During the sparking stage of the ignition sequence approximately
22V DC should be present between pin 1 (red) and pin 2 (black)
at connector X4 on the PCB.
Note:
If boiler goes to lockout reset as necessary until test complete.