Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Unclip diverter valve and place in a position where the diverter spindle can be easily observed
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Tap reset button to skip self check.
Allow boiler to start to run for CH demand.
Is the diverter spindle in the fully retracted position?
(As shown in picture)
Allow boiler to start to run for CH demand.
Is the diverter spindle in the fully retracted position?
(As shown in picture)