Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Disconnect the inline plug from the flow sensor
Measurement:
Measure for continuity (zero resistance) on each wire of the flow turbine harness.
Red to Red (pin 8 on LV2)
Black to Black (pin 9 on LV2)
Yellow to Yellow (pin 10 on LV2)
Inspect harness and connectors for good overall condition.
Is the harness satisfactory?
Red to Red (pin 8 on LV2)
Black to Black (pin 9 on LV2)
Yellow to Yellow (pin 10 on LV2)
Inspect harness and connectors for good overall condition.
Is the harness satisfactory?

Isolate as per TOPs P4
and refit as necessary