Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to PCB (use Insulation Mat as required)
Run hot water tap at a flow rate of 3 - 4 l/min
Run hot water tap at a flow rate of 3 - 4 l/min
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between pin 9 (black) and pin 10 (yellow)
at LV2 on the PCB.
The voltage measured should be approximately 2.7V DC.
Is the voltage measured as expected?
Note:
Voltage is likely to fluctuate on the multimeter display.
at LV2 on the PCB.
The voltage measured should be approximately 2.7V DC.
Is the voltage measured as expected?
Note:
Voltage is likely to fluctuate on the multimeter display.
