Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Close DHW service valve, located on the 15 mm supply pipe 2nd in from the right hand side of the boiler.
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Does the boiler still attempt to fire?