Set Appliance State:
Mains Power Off
CH Demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Reset appliance as necessary and allow it to run until its shuts down with overheat fault code.
Disconnect wires from the overheat stat
Measure resistance across the terminals of the overheat stat.
Expected resistance short circuit (zero resistance).
| Isolate Mains Power to appliance as per TOP's P4 |
Measure resistance across the terminals of the overheat stat.
Expected resistance short circuit (zero resistance).

Isolate as per TOPs P4
and refit as necessary