Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow boiler self check to complete.
Hold down the       button for at least 5 seconds to enable service mode.
(MAX should be shown on the display).
Measure the voltage across pin 5 (brown)
and pin 6 (blue) on connector HV1.
Mains voltage expected.
To turn service mode off press the       button once.