Set Appliance State:
Mains Power Off
Turn Hot Water Tap On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Allow boiler to ignite and run.
With a flow rate at the tap of approximately;
9.0 l/min - Greenstar 25i ErP, is there a temperature rise of 40°C +/- 15%.
11.0 l/min - Greenstar 30i ErP, is there a temperature rise of 40°C +/- 15%.
Is DHW operation satisfactory?
With a flow rate at the tap of approximately;
Is DHW operation satisfactory?