Set Appliance State:
Mains Power Off
CH Demand
CH temperature control set to MAX
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Preheat switched OFF (ECO button illuminated) A.S.A.P after power reinstated.
Allow the boiler to ignite and run on central heating operation.
Is the heating operating correctly?
Allow the boiler to ignite and run on central heating operation.
Is the heating operating correctly?