Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
CH Demand
On/Off Switch ON
Remove Pump DC Connector from PCB
DHW Thermostat to Minimum
CH Thermostat to Minimum
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Measure the DC voltage between the top and bottom terminals.
Expect approximately 1 vdc
With Probes still on the PCB terminals turn the CH thermostat to Maximum.
The voltage should increase to approximately 4 vdc
Note:
This voltage rise only occurs once on the initial start-up of the pump, if you wish to repeat the test follow the setup from the beginning of this test.