Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use isolation mat as required)
Gas On
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the pump lead at the connector on the PCB.
The connector is located at the back of the PCB beneath the pump.
The connector is located at the back of the PCB beneath the pump.

Isolate as per TOPs P4
and refit as necessary