Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
Remove the red leads from the CH differential pressure switch and make safe
WARNING! Mains voltage is expected during test, follow TOPs P4 live testing procedure
Mains Power On

Measurement:

Test 1:
Measure the resistance across the microswitch.
Expect open circuit.
Test 2:
CH demand, allow pump to run.
Measure the resistance across the microswitch.
Expect continuity / zero resistance.