Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Disconnect the timer and fit a wire link between the two bottom left connections (as shown in the image)
If available use timer link supplied with boiler
Ensure links are still in place from previous test
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now fire on a heating demand?