Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Remove electrical connector to spark generator.
Measurement:
Measure for resistance across pins 1 & 2 of the spark generator connection (see note).
Expected resistance approximately 270 kOhms.
Note.
It may be easier to carry out this test with the spark generator removed from boiler.
Expected resistance approximately 270 kOhms.
Note.
It may be easier to carry out this test with the spark generator removed from boiler.

Isolate as per TOPs P4
and refit as necessary