Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Cancel purge cycle & If required, reset boiler.
Allow ignition sequence to commence.
Measure for mains voltage across pins 5 & 6 of PCB connector CN2.
Approximately 4 seconds after the fan has started mains voltage should be measured (see note).
Notes:
1. Voltage duration is approximately 10 seconds with a 3 second interval, The boiler will enter lockout after 5 attempts of ignition, reset boiler as required until test is complete.
2. Connector CN2 may differ in appearance but test points remain the same.