Set Appliance State:

Gas Off
Isolate Mains Power to appliance as per TOPs P4
Turn Hot Water Tap On
Attach U-gauge to gas inlet pressure test point
Gas On
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Cancel purge cycle & if required, reset boiler.
Allow ignition sequence to commence and
boiler to ignite and ramp up for DHW demand.
Inlet pressure should remain above N.G. 20 mb, L.P.G. 37mb throughout the ignition sequence.
Note.
1.The boiler will enter lockout after 5 attempts of ignition, approximately 3 seconds between each attempt, reset as required until test is complete.
2. When the test is complete the pressure test point should be tightened and checked for gas soundness.