Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Cancel purge cycle & if required, reset boiler.
Allow ignition sequence to commence.
Measure for A/C voltage across the brown & blue
electrical connections of PCB connector CN1.
Approximately 4 seconds after the fan has started
mains voltage should be measured (see note).