Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Cancel purge cycle & if required, reset boiler.
Allow ignition sequence to commence.
Measure for A/C voltage across the brown & blue
electrical connections of PCB connector CN1.
Approximately 4 seconds after the fan has started
mains voltage should be measured (see note).
Allow ignition sequence to commence.
Measure for A/C voltage across the brown & blue
electrical connections of PCB connector CN1.
Approximately 4 seconds after the fan has started
mains voltage should be measured (see note).

Isolate as per TOPs P4
and refit as necessary