Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Remove actuator from the 3-way valve assembly & place in a safe position to observe its operation
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Observation:
Cancel purge cycle & if required, reset boiler.
Allow the boiler to operate for CH.
Confirm actuator spindle is in the out position (CH).
Allow the boiler to operate for CH.
Confirm actuator spindle is in the out position (CH).
Isolate as per TOPs P4
and refit as necessary