Set Appliance State:
Mains Power Off
Allow boiler self-check & purge cycle to commence
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
During the boiler self-check & purge cycle;
Test 1.
Measure for DC voltage across pin 3 CN8 on PCB & a suitable earth connection.
 
Expected voltage approximately 28 Vdc.
Test 2.
Measure for DC voltage across pin 2 CN8 on PCB & a suitable earth connection.
 
Expected voltage should be seen to fluctuate between 0 - 2.0 Vdc approximately.
Test 1.
Measure for DC voltage across pin 3 CN8 on PCB & a suitable earth connection.
 
Expected voltage approximately 28 Vdc.
Test 2.
Measure for DC voltage across pin 2 CN8 on PCB & a suitable earth connection.
 
Expected voltage should be seen to fluctuate between 0 - 2.0 Vdc approximately.

Isolate as per TOPs P4
and refit as necessary