Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to Resistance Set meter to measure resistance
Ensure No CH demand is present
Wires disconnected from CN5 (previous test)

Measurement:

Measure for resistance across the terminals of connector M2.
Expected resistance open circuit.