Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to DC Volts Set meter to measure DC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
Pull connector X3 back slightly to expose test pins
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset appliance as necessary.
Measure the DC voltage between pins 2 and 3 on connector X3 on the PCB.
Approximately 210 - 230 VDC should be measured for 3 seconds as power is sent to the gas valve.
This will be repeated 5 times at 20 second intervals until lockout occurs.
Is the voltage measured as expected?
Notes:
1. Timings quoted are approximate.
2. Reset appliance and repeat test as necessary until outcome is determined.