Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Gain access to the boilers main terminal strip
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage between the leftmost connection marked "FROST STAT" to the "MAINS IN" N connection at the mains terminal strip.
Note:
If no frost stat is fitted select that option below.
Note:
If no frost stat is fitted select that option below.

Isolate as per TOPs P4
and refit as necessary