Set Appliance State:
Mains Power Off
CH Demand
Selector switch set to CH/DHW
CH temperature control set to MAX
Preheat switched OFF
Attach temperature clamps to the flow and return pipes
underneath boiler, as close to the boiler as possible
CH temperature control set to MAX
Preheat switched OFF
Attach temperature clamps to the flow and return pipes
underneath boiler, as close to the boiler as possible
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Allow the boiler to run for central Heating, until noise or kettling begins.
Measure the temperature differential across flow and return.
Expected a differential of approx. 22°C or lower.
Note.
Ensure all radiators are open and system is balanced correctly
to provide correct test results.
Measure the temperature differential across flow and return.
Expected a differential of approx. 22°C or lower.
Note.
Ensure all radiators are open and system is balanced correctly
to provide correct test results.