Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
CH Demand
Place a wire link between the 2 leftmost connections at the main terminal strip labelled "ROOM STAT / TIMER"
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Does the boiler now fire on a heating demand ?