Set Appliance State:

Mains Power Off
Preheat OFF
Apply a demand for Heating or Hot Water
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Once the boiler has reached a reasonable temperature switch off the demand, the Fan and Pump should overrun.
The fan will always run for 4min.
The length of the pump overrun depends on the type of demand:
Central Heating demand - 4min.
Hot Water demand - 1min.
When the demand ends does the overrun period follow the above description?