Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Boiler mains switch ON
CH Demand
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Allow the ignition sequence to commence and burner to ignite.
Measure the voltage across the red and purple leads at the diverter valve connector at the PCB.