Set Appliance State:

Ensure secondary heat exchanger is cool, this can be done by running a hot tap with the boiler switched off
Hot Water Tap OFF
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Observation:

Allow preheat to complete, this is indicated by the tap symbol disappearing from the display.