Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
CH Demand
Preheat OFF
Boilers Heating Temperature Control to OFF position
Boilers Heating Temperature Control to OFF position
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the Switched Live Input (Main terminal strip, 2nd from left, black wire) and the Main Neutral on the main terminal strip.
Expect Mains Voltage.
Expect Mains Voltage.

Isolate as per TOPs P4
and refit as necessary