Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Preheat OFF
Apply demand
Apply demand
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Measure the voltage across the Live (Brown, pin 1) and Neutral (Blue, pin 2) leads at connector X1C on the PCB.
Expect mains voltage.
Expect mains voltage.

Isolate as per TOPs P4
and refit as necessary