Set Appliance State:

Isolate Mains Power to appliance as per TOPs P4
Set Multimeter to AC Volts Set meter to measure AC Volts
Turn Hot Water Tap On
Gain access to PCB (use Insulation Mat as required)
WARNING! - Mains voltage is expected during test follow
TOPs P4 live testing procedure
Mains Power On

Measurement:

Reset appliance as necessary.
Once the appliance begins the sparking stage of its ignition sequence:
Test 1:
Measure the voltage between the brown
and blue wires at connector J3 on the ignition PCB.
Mains voltage expected.
Test 2:
Measure the voltage between the black
and blue wires at connector J3 on the ignition PCB.
Mains voltage expected.
Note:
Boiler will only attempt ignition once before going to lockout.
Reset as necessary until tests are complete.