Set Appliance State:
| Isolate Mains Power to appliance as per TOPs P4 |
Turn Hot Water Tap On
Remove combustion chamber
| WARNING! - Mains voltage is expected during test follow TOPs P4 live testing procedure |
Measurement:
Approximately 8 seconds after mains power is turned on, measure the voltage between the black and blue wires at the fan.
Mains voltage expected.
Mains voltage expected.

Isolate as per TOPs P4
and refit as necessary